Stormwater management for compliance with the Department of Conservation and Recreation for the Commonwealth of Virginiaĭuring the proposed storm system design it was discovered that upstream offsite impervious areas south of the existing parking lot, are currently transporting storm runoff via several storm structures and pipe through the existing parking lot storm system. Timmons Group provided land surveying, civil engineering design, permitting, and construction administration services for the project which included:Īpproximately 43,000 sf of building addition The building addition allows for pedestrian access and egress, and service deliveries through Building 1500. The proposed improvements as per the RFP provided by NAVFAC included a building addition to existing Building 1500, and an existing parking lot expansion to add 344 proposed spaces to the existing 838 spaces for a total of 1,182 spaces. Department of the Navy NAVFAC Mid-Atlantic.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |